The Daytona Beach Resort includes a 5-story conventionally reinforced concrete building with a 14-story post-tensioned concrete tower constructed above a 6-story post-tensioned concrete parking garage. The buildings underwent a large restoration following the hurricanes around 2004. UEC was hired in 2008 to provide engineering services for structural repair of the parking structure and has maintained a close working relationship with the resort management. Several projects have been completed since that UEC managed which include two concrete and post-tensioned cable repair projects and a waterproofing project for the entire complex.